Innovative solutions to minimize electrolysis stack degradation and green hydrogen production costs

IRAUNKOR

Context

The deployment of the renewable hydrogen market will largely depend on the levelized cost of hydrogen (LCOH). To reduce this, it is essential to improve electrolyzer efficiency and reduce component degradation, which has a significant impact on performance and service life.

Under intermittent operating conditions, such as in systems coupled to renewable energy, the efficiency and durability of electrolyzers are greatly affected and depend largely on the design and components of the stack, as well as the operating conditions.

CHALLENGE

IRAUNKOR seeks to exhaustively investigate the impact of operating conditions on the degradation of low-temperature stacks throughout their service life using standardized protocols.

The knowledge of degradation parameters acquired during the project will enable the development of innovative solutions that minimize such degradation, making green hydrogen production possible at a competitive cost.

Critical Parameters and Degradation Mechanisms

  • High current densities
  • Frequent starts and stops
  • Current fluctuation
  • Load ramps
  • Anodic and cathodic polarization
  • Component leaching
  • Active site limitation
  • Passivation
  • Dissolution
  • Precipitate formation
  • Reverse currents

Areas of Action

03 InfografiaIraunkor

EXPECTED RESULTS

  • Stack degradation testing protocols
  • Analysis of the impact of operating parameters on stacks
  • Degradation models under realistic conditions
  • Optimal operating strategies for each technology

Consortium Capabilities

AWE

AWE BUENA

Stack 1:

  • Power: 0.9 kW
  • Active area: 177 cm
  • Number of cells: 5
  • Total flow: 60 L/h
  • Nominal current density: 0.3 A/cm^2
  • Pressure: < 8 bar

Stack 2:

  • Power: 3 kW
  • Active area: 500 cm2
  • Number of cells: 5
  • Total flow: 100 L/h
  • Nominal current density: 0.4 A/cm^2
  • Pressure: 30 bar
FUNDACION TEKNIKER

PEM

PEM buena

Stack 1:

  • Power: 0.125 kW
  • Active area: 25 cm2
  • Number of cells: 5
  • Total flow: 60 L/h
  • Nominal current density: 1 A/cm^2
  • Pressure: < 6 bar

Stack 2:

  • Power: 8.5 kW
  • Active area: 400 cm2
  • Number of cells: 5
  • Total flow: 100 L/h
  • Nominal current density: 3 A/cm^2
  • Pressure: 30 bar
GOI MONDRAGON 1

AEM

AEM BUENA

Stack:

  • Power: 1kW
  • Active area: 80 cm2
  • Number of cells: 6
    Total flow: 180 L/h
  • Nominal current density: 1 A/cm^2
  • Pressure: 0-16 bar
haizeeko agentes tecnalia

Test Infrastructure

teknier

Bench:

  • Maximum power: 5 kW
  • Maximum current: 500 A
  • Maximum voltage: 15 V
  • Maximum pressure: 30 bar
  • Maximum temperature: 90°C
    Double hydraulic circuit connected and/or separate
FUNDACION TEKNIKER
Iraunkor Banco1 MU

Bench 1:

  • Maximum power: 0.5 kW
  • Maximum current: 30 A
  • Maximum voltage: 60 V
  • Maximum pressure: 6 bar
  • Maximum temperature: 80°C
  • Up to 4 stacks with hydraulic circuit connected between 2 stacks and/or individual electrical circuit per stack
GOI MONDRAGON 1
pemMU

Bench 2:

  • Maximum power: 25 kW
  • Maximum current: 200 A
  • Maximum voltage: 60 V
  • Maximum pressure: 30 bar
  • Maximum temperature: 120°C
    Up to 3 stacks with individual hydraulic and/or electrical circuit per stack
GOI MONDRAGON 1
AEM TECNALIA2

Bench:

  • Maximum power: 2.4 kW
  • Maximum current: 200 A
  • Maximum voltage: 12 V
  • Maximum pressure: 25 bar
  • Maximum temperature: 90°C
  • Up to 6 cells with individual control
  • Dry and/or wet cathode
  • Single cells of 5, 25 and/or 100 cm^2
haizeeko agentes tecnalia

LATEST NEWS

IRAUNKOR News

CONSORTIUM

FUNDACION TEKNIKER
mondragon unibertsitatea
haizeeko agentes tecnalia
logo

Advisory Committee

SARRALLE
Petronor Innovacion Logo Horizontal Sin Fondo
cropped NORDEXelectrolyzers color
ingeteam logo png fondo transparente 1
Saitec Engineering PNG
TSK Logo
SENER INGENIERIA Y SISTEMAS
* Project subsidized by the Department of Industry, Energy Transition and Sustainability of the Basque Government (ELKARTEK 2025 Program).
haizeeko finan 1
Scroll to Top